Field notes
Notes from energy reporting work
Short pieces on meters, peaks, and how facility operators prepare packs for ownership — drawn from System Gridhub engagements in Thailand.
-
How to read an interval meter extract without drowning in rows
A practical sequence for facility operators who receive CSV exports and need to spot peaks, base load, and gaps before asking for a full report.
Read note -
Peak windows in mixed-use buildings: what operators usually miss
Retail podiums, office floors, and residential towers share a transformer more often than they share a schedule. Here is how to separate the peaks.
Read note -
Preparing energy charts for an ownership review
What building owners in Thailand typically ask, and which three slides actually earn their attention.
Read note -
Chiller schedules, night base load, and the quiet cost of “always ready”
Plant rooms that stay warm for unexpected tenants often pay for readiness all night. A short checklist before you change a setpoint.
Read note